01
Situation
- Quotes wait in a queue behind one or two estimators.
- Two estimators price the same part differently.
- Nobody knows which quotes lost money until the job is done.
Fabricators
Example industry study
Buyers send the same RFQ to several shops, and the first credible quote back often wins. Cut length, pierces, bends, material and machine time can all be worked out from the flat pattern at your own rates. The estimator checks the result and makes the judgment calls.
01
02
03
Every figure says where it comes from. Vendor claims are marked as vendor claims.
51% vs 41%
Win rate on new work for shops that quote within a day, against slower shops.
67%
Share of part buyers who expect a quote back in under 24 hours.
$37.86/h
US median wage for a cost estimator, before benefits.
Try it on sample data
Cut length, holes and bends come straight from the part. Change the material, quantity or your rates and the price updates.
Try the demoGood to know
An example built from what we see in manufacturing and from published figures. It is not a client story.
How we would do it
Every study follows the same steps: find the bottleneck, redesign the work, test the fix, and keep the math where you can check it.