01
Situation
- Inspectors balloon drawings and type characteristic lists by hand for every new part.
- Reports get rejected for paperwork mistakes, not bad parts.
- New-part launches wait on inspection paperwork.
Contract and Swiss shops
Example industry study
A first article report starts with ballooning the drawing and listing every characteristic with its target and tolerance. On a busy drawing that takes an hour or more before a single part is measured. Generated from the drawing, the list is ready in seconds and the inspector only enters readings.
01
02
03
Every figure says where it comes from. Vendor claims are marked as vendor claims.
~1 min
Per characteristic to balloon a drawing by hand: 30 to 40 minutes for a 30 to 40 characteristic drawing.
79
Characteristics our generator numbered on one sample manifold block, in under a second.
2.2% vs 3.3%
Scrap and rework as a share of sales at the best machine shops against the rest.
$23.35/h
US median wage for inspectors and testers, before benefits.
Try it on sample data
The drawing comes ballooned, with every dimension numbered and listed. Type the readings and see what is out of tolerance.
Try the demoGood to know
An example built from what we see in manufacturing and from published figures. It is not a client story.
How we would do it
Every study follows the same steps: find the bottleneck, redesign the work, test the fix, and keep the math where you can check it.